{"id":5204,"date":"2026-09-29T21:30:46","date_gmt":"2026-09-29T13:30:46","guid":{"rendered":"https:\/\/beyondinfosys.com\/?p=5204"},"modified":"2026-09-23T14:31:23","modified_gmt":"2026-09-23T06:31:23","slug":"modernizing-legacy-machines-without-replacing-the-plc","status":"publish","type":"post","link":"https:\/\/beyondinfosys.com\/fr\/modernizing-legacy-machines-without-replacing-the-plc\/","title":{"rendered":"Moderniser les machines existantes sans remplacer l'automate programmable"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5204\" class=\"elementor elementor-5204\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d0cc894 e-flex e-con-boxed e-con e-parent\" data-id=\"d0cc894\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da6235b elementor-widget elementor-widget-text-editor\" data-id=\"da6235b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2><b>How an Industrial Panel PC Can Support Legacy Machine Modernization<\/b><\/h2><p><span style=\"font-weight: 400;\">Many factories still rely on legacy machines that have operated reliably for years. Their PLCs run established control programs, operators understand the equipment, and the machines may continue to meet production requirements.<\/span><\/p><p><span style=\"font-weight: 400;\">The challenge is often not the PLC itself.<\/span><\/p><p><span style=\"font-weight: 400;\">The existing HMI or operator display may be outdated, replacement parts may be difficult to source, and the interface may no longer provide the visibility operators need. As a result, manufacturers, OEMs, and system integrators may face an important question:<\/span><\/p><p><b>Can you modernize a legacy machine without replacing the PLC?<\/b><\/p><p><span style=\"font-weight: 400;\">In some applications, the answer may be yes.<\/span><\/p><p><span style=\"font-weight: 400;\">If the existing PLC remains suitable for its control responsibilities, an <\/span><b>Panel PC industriel<\/b><span style=\"font-weight: 400;\"> can be considered as part of an HMI or operator-interface modernization project. The PLC may continue executing established machine control logic while the Panel PC provides a modern computing and display platform for approved operator applications.<\/span><\/p><p><span style=\"font-weight: 400;\">However, successful integration depends on PLC communication, accessible data, HMI software, control requirements, installation conditions, and the overall system architecture.<\/span><\/p><p><span style=\"font-weight: 400;\">Rather than assuming that either the PLC or HMI must be replaced, the modernization project should begin with an engineering assessment.<\/span><\/p><h2><b>Legacy Machine Modernization Starts with Scope, Not Hardware<\/b><\/h2><p><span style=\"font-weight: 400;\">A legacy machine may need a more readable operator interface, clearer machine status information, improved alarm visibility, or a replacement for an obsolete display.<\/span><\/p><p><span style=\"font-weight: 400;\">None of these requirements automatically means that the PLC must be replaced.<\/span><\/p><p><span style=\"font-weight: 400;\">At the same time, installing a new Industrial Panel PC does not automatically make it compatible with an existing PLC.<\/span><\/p><p><span style=\"font-weight: 400;\">Before selecting hardware, the engineering team should document:<\/span><\/p><ul><li><span style=\"font-weight: 400;\">PLC manufacturer and model<\/span><\/li><li><span style=\"font-weight: 400;\">Available communication ports and protocols<\/span><\/li><li><span style=\"font-weight: 400;\">Required PLC tags, registers, or variables<\/span><\/li><li><span style=\"font-weight: 400;\">Existing HMI model and software<\/span><\/li><li><span style=\"font-weight: 400;\">Availability of HMI project files and backups<\/span><\/li><li><span style=\"font-weight: 400;\">Required operator functions<\/span><\/li><li><span style=\"font-weight: 400;\">Panel dimensions and mounting requirements<\/span><\/li><li><span style=\"font-weight: 400;\">Environmental and electrical conditions<\/span><\/li><li><span style=\"font-weight: 400;\">Network and cybersecurity requirements<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">The team should also establish which functions remain with the PLC and which functions are expected from the new operator interface.<\/span><\/p><p><span style=\"font-weight: 400;\">This distinction is important because replacing an operator terminal, installing a Panel PC, modifying PLC control logic, and redesigning machine safety functions are different engineering activities.<\/span><\/p><p><span style=\"font-weight: 400;\">They may form part of the same modernization project, but each requires an appropriate scope, technical review, and validation process.<\/span><\/p><h2><b>Where an Industrial Panel PC Fits into a PLC-Based Machine<\/b><\/h2><p><span style=\"font-weight: 400;\">Un <\/span><b>Panel PC industriel<\/b><span style=\"font-weight: 400;\"> combines a display and computing platform in a machine-side form factor.<\/span><\/p><p><span style=\"font-weight: 400;\">Depending on the application software and verified system interfaces, it may provide a platform for displaying PLC-supplied information or running approved operator applications.<\/span><\/p><p><span style=\"font-weight: 400;\">A possible architecture is:<\/span><\/p><p><b>Existing PLC \u2192 Communication Interface \u2192 Industrial Panel PC \u2192 Operator Application<\/b><\/p><p><span style=\"font-weight: 400;\">In this arrangement, the existing PLC continues to perform its established machine-control functions, while the Industrial Panel PC supports the operator-facing information and application layer.<\/span><\/p><p><span style=\"font-weight: 400;\">This does <\/span><b>pas<\/b><span style=\"font-weight: 400;\"> mean that a Panel PC replaces the PLC.<\/span><\/p><p><span style=\"font-weight: 400;\">It also does not mean that a Panel PC can automatically discover PLC data, communicate through every proprietary protocol, or recreate an existing HMI application. These capabilities depend on the PLC, communication architecture, software, drivers, licensing, project files, and engineering implementation.<\/span><\/p><p><span style=\"font-weight: 400;\">A modernization project should therefore answer three questions before hardware selection:<\/span><\/p><p><b>What does the operator need to see or do?<\/b><\/p><p><b>Which system provides the required information or control authority?<\/b><\/p><p><b>What hardware, software, communication, and installation changes are required to implement it?<\/b><\/p><h2><b>4 Key Areas to Assess Before Integrating an Industrial Panel PC with an Existing PLC<\/b><\/h2><h3><b>1. PLC Communication and Data Access<\/b><\/h3><p><span style=\"font-weight: 400;\">Start by identifying the PLC manufacturer, model, available communication ports, supported communication methods, and available engineering documentation.<\/span><\/p><p><span style=\"font-weight: 400;\">The engineering team should confirm whether the required PLC tags, registers, or variables are accessible and whether the intended access is permitted within the existing system architecture.<\/span><\/p><p><span style=\"font-weight: 400;\">This is particularly important for older PLCs.<\/span><\/p><p><span style=\"font-weight: 400;\">A legacy machine may use proprietary communication interfaces, older serial connections, or software that requires specific drivers, licenses, communication modules, or gateways.<\/span><\/p><p><span style=\"font-weight: 400;\">The presence of an Ethernet or serial port alone does not confirm that an Industrial Panel PC can access the required machine data.<\/span><\/p><p><span style=\"font-weight: 400;\">Communication feasibility should therefore be verified before committing to a specific Panel PC configuration or system architecture.<\/span><\/p><h3><b>2. HMI Functions and Control Authority<\/b><\/h3><p><span style=\"font-weight: 400;\">Next, define what operators actually need from the new interface.<\/span><\/p><p><span style=\"font-weight: 400;\">Typical requirements may include:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Viewing machine operating status<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Monitoring process information<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing alarms and events<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Acknowledging alarms<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Entering operating parameters<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Accessing maintenance information<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">For every function, identify the data source, user permissions, expected behavior, and validation requirements.<\/span><\/p><p><span style=\"font-weight: 400;\">A display-only interface can have a very different engineering scope from an HMI that writes parameters or commands back to the PLC.<\/span><\/p><p><span style=\"font-weight: 400;\">If the new Panel PC application must modify PLC values or issue commands, the engineering team should determine which operations are permitted and whether PLC program changes are required.<\/span><\/p><p><span style=\"font-weight: 400;\">Safety-related functions should remain within the machine&#8217;s appropriate safety architecture and should not be assumed to transfer to a general-purpose operator interface.<\/span><\/p><h3><b>3. Mechanical, Electrical, and Environmental Requirements<\/b><\/h3><p><span style=\"font-weight: 400;\">Software compatibility is only part of a legacy machine upgrade.<\/span><\/p><p><span style=\"font-weight: 400;\">The new Industrial Panel PC must also fit the physical installation and operating environment.<\/span><\/p><p><span style=\"font-weight: 400;\">Before selecting a unit, document:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Existing panel cut-out<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Display size<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mounting depth<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Available installation space<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Power requirements<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Grounding arrangement<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cable routing<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ventilation conditions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Required I\/O<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Operating temperature<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dust and moisture exposure<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Vibration conditions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cleaning practices<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Other site-specific environmental requirements<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">Legacy machines rarely have identical panel dimensions or installation conditions. Depending on the project, modifications to mounting, enclosure design, cable access, or I\/O configuration may be required.<\/span><\/p><p><span style=\"font-weight: 400;\">Machine drawings, photographs, wiring information, and an on-site assessment can help establish these requirements before final hardware selection.<\/span><\/p><h3><b>4. HMI Software, Maintenance, and Cybersecurity<\/b><\/h3><p><span style=\"font-weight: 400;\">A successful HMI modernization project should also consider the software lifecycle.<\/span><\/p><p><span style=\"font-weight: 400;\">Identify the existing HMI software or runtime environment, required operating system, licensing model, application files, software versions, backup procedures, and maintenance responsibilities.<\/span><\/p><p><span style=\"font-weight: 400;\">The project should answer practical service questions such as:<\/span><\/p><p><b>Who owns and maintains the HMI application?<\/b><\/p><p><b>Where are the project files and backups stored?<\/b><\/p><p><b>How will the system be restored if the Panel PC requires service or replacement?<\/b><\/p><p><span style=\"font-weight: 400;\">If the machine will connect to a factory network, the project should also involve the customer&#8217;s automation and IT teams.<\/span><\/p><p><span style=\"font-weight: 400;\">Account permissions, network segmentation, remote access, software updates, and maintenance procedures should follow the site&#8217;s applicable cybersecurity policies.<\/span><\/p><p><span style=\"font-weight: 400;\">These requirements affect the complete system architecture and should be evaluated before the hardware configuration is finalized.<\/span><\/p><h2><b>A 5-Stage Process for Legacy Machine and HMI Modernization<\/b><\/h2><p><span style=\"font-weight: 400;\">A staged assessment can help OEMs, manufacturers, and system integrators identify technical dependencies before modifying a production machine.<\/span><\/p><h3><b>Stage 1: Document the Existing PLC and HMI System<\/b><\/h3><p><span style=\"font-weight: 400;\">Gather the PLC and HMI models, electrical drawings, wiring information, communication interfaces, software versions, project backups, and operator procedures.<\/span><\/p><p><span style=\"font-weight: 400;\">Document both what currently works and what has become difficult to operate or maintain.<\/span><\/p><h3><b>Stage 2: Define the Required Operator Functions<\/b><\/h3><p><span style=\"font-weight: 400;\">List the information operators need to see and the actions they need to perform.<\/span><\/p><p><span style=\"font-weight: 400;\">Also define user permissions and expected behavior during communication loss, power interruption, or system restart.<\/span><\/p><p><span style=\"font-weight: 400;\">This converts a broad request such as \u201cmodernize the machine\u201d into a specific and reviewable project scope.<\/span><\/p><h3><b>Stage 3: Verify PLC Communication and Integration Feasibility<\/b><\/h3><p><span style=\"font-weight: 400;\">Confirm which PLC data can be accessed, which communication methods and software are required, and whether changes to the PLC program are necessary.<\/span><\/p><p><span style=\"font-weight: 400;\">Any unresolved compatibility issues should be identified before the project proceeds to final hardware selection.<\/span><\/p><h3><b>Stage 4: Configure and Verify the Industrial Panel PC<\/b><\/h3><p><span style=\"font-weight: 400;\">Review the required:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Display dimensions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Montage sur panneau<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Power input<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">I\/O configuration<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Computing platform<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Memory and storage<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Operating system<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Application compatibility<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Network requirements<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">The project team should also establish how communications, alarms, permissions, application behavior, and system recovery will be verified.<\/span><\/p><h3><b>Stage 5: Plan Installation, Commissioning, and Support<\/b><\/h3><p><span style=\"font-weight: 400;\">Before installation, agree on the production window, acceptance criteria, backups, documentation, test procedures, and fallback plan with the responsible production and equipment teams.<\/span><\/p><p><span style=\"font-weight: 400;\">Commissioning should reflect the machine&#8217;s operational and safety requirements.<\/span><\/p><p><span style=\"font-weight: 400;\">This process does not guarantee that every legacy PLC can or should be retained. Instead, it provides a structured way to determine whether retaining the existing PLC is technically practical and what additional engineering work is required.<\/span><\/p><h2><b>Industrial Panel PC Configuration for Legacy Machines<\/b><\/h2><p><span style=\"font-weight: 400;\">Legacy machines often differ in panel cut-outs, installation depth, communication interfaces, I\/O requirements, computing needs, and environmental conditions.<\/span><\/p><p><span style=\"font-weight: 400;\">For this reason, an Industrial Panel PC project may need to evaluate different configuration options, including:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Display size<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mounting method<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">I\/O configuration<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Computing platform<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">M\u00e9moire<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Stockage<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Software compatibility<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mechanical modifications<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">These should be treated as project-specific evaluation items rather than assumed product capabilities.<\/span><\/p><p><span style=\"font-weight: 400;\">Actual configuration options depend on the selected product platform and application requirements.<\/span><\/p><p><span style=\"font-weight: 400;\">Providing machine drawings, panel dimensions, photographs, PLC information, and the required operator workflow early in the project gives the equipment builder or system integrator a stronger basis for evaluating feasibility.<\/span><\/p><h2><b>Modernize the Operator Interface While Keeping a Suitable PLC<\/b><\/h2><p><span style=\"font-weight: 400;\">Replacing an aging operator interface does not necessarily require replacing an otherwise suitable PLC.<\/span><\/p><p><span style=\"font-weight: 400;\">Where engineering review supports the architecture, an Industrial Panel PC can help modernize the operator and information layer while the existing PLC continues performing its established control role.<\/span><\/p><p><span style=\"font-weight: 400;\">In other cases, the assessment may reveal that the PLC, HMI software, communication architecture, or other parts of the control system also require modification.<\/span><\/p><p><span style=\"font-weight: 400;\">The objective should therefore not be to retain the existing PLC at any cost.<\/span><\/p><p><span style=\"font-weight: 400;\">Instead, each component should be replaced or retained for a clear technical, operational, and maintenance reason.<\/span><\/p><h2><b>Plan for Long-Term Machine Maintainability<\/b><\/h2><p><span style=\"font-weight: 400;\">The display is only one part of a sustainable modernization strategy.<\/span><\/p><p><span style=\"font-weight: 400;\">OEMs and plant engineering teams should also document:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">PLC interfaces<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">PLC data mappings<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">HMI project files<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Software versions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">User permissions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">System backups<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Spare-part requirements<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Commissioning results<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintenance responsibilities<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">Early coordination between controls engineering, mechanical engineering, IT, procurement, and production teams can help identify integration requirements before installation.<\/span><\/p><p><span style=\"font-weight: 400;\">It also helps distinguish a hardware replacement from a broader control-system modernization project.<\/span><\/p><p><span style=\"font-weight: 400;\">The required scope, cost, downtime, and engineering effort will vary by machine and should be determined from project-specific information.<\/span><\/p><h2><b>Start with the Legacy Machine You Already Have<\/b><\/h2><p><span style=\"font-weight: 400;\">Modernizing a legacy machine does not always require an immediate full-system replacement.<\/span><\/p><p><span style=\"font-weight: 400;\">If the existing PLC remains suitable for its control responsibilities, an Industrial Panel PC may be considered as part of an operator-interface or HMI modernization project.<\/span><\/p><p><span style=\"font-weight: 400;\">Whether this architecture is practical depends on PLC communications, accessible data, software compatibility, installation conditions, operator requirements, and the overall system design.<\/span><\/p><p><span style=\"font-weight: 400;\">For an initial assessment, prepare:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">PLC manufacturer and model<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Existing HMI model<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Available communication interfaces<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">HMI or PLC engineering documentation<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Panel cut-out and installation dimensions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Required operator functions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Environmental conditions<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Network and maintenance requirements<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">BIS can discuss <\/span><b>Industrial Panel PC configuration and project integration requirements<\/b><span style=\"font-weight: 400;\"> based on this information and help identify the items that need to be confirmed during the engineering review.<\/span><\/p><h2><b>Frequently Asked Questions<\/b><\/h2><h3><b>Can I upgrade an HMI without replacing the PLC?<\/b><\/h3><p><span style=\"font-weight: 400;\">Potentially. If the existing PLC remains suitable for its control responsibilities, the project can evaluate whether a new operator interface can communicate with it. Compatibility depends on the PLC model, communication interfaces, accessible data, HMI software, and required operator functions.<\/span><\/p><h3><b>Can an Industrial Panel PC connect to an existing PLC?<\/b><\/h3><p><span style=\"font-weight: 400;\">It may be possible, but the available physical port alone does not establish compatibility. The engineering team should verify the PLC communication method, accessible tags or registers, required software or drivers, and whether additional communication hardware is necessary.<\/span><\/p><h3><b>Does an Industrial Panel PC replace a PLC?<\/b><\/h3><p><span style=\"font-weight: 400;\">Not necessarily. In the architecture discussed here, the PLC continues executing established machine-control logic while the Industrial Panel PC provides an operator-facing computing and display platform. The exact division of functions depends on the system design.<\/span><\/p><h3><b>What information is needed before upgrading a legacy HMI?<\/b><\/h3><p><span style=\"font-weight: 400;\">Useful information includes the PLC and existing HMI models, communication interfaces, available engineering files, panel dimensions, wiring or system drawings, required operator functions, and environmental conditions. Network and maintenance requirements should also be provided where applicable.<\/span><\/p><h3><b>What Industrial Panel PC configuration options can be evaluated?<\/b><\/h3><p><span style=\"font-weight: 400;\">Depending on the product platform and project specification, the project can review display size, mounting, I\/O, computing configuration, memory, storage, software compatibility, and mechanical requirements. Actual feasibility must be confirmed for the selected platform and application.<\/span><\/p><h2><b>Discuss Your Legacy Machine Modernization Project <a href=\"https:\/\/beyondinfosys.com\/fr\/contact\/\">with BIS<\/a><\/b><\/h2><p><span style=\"font-weight: 400;\">Planning an <\/span><b>HMI upgrade or legacy machine modernization project<\/b><span style=\"font-weight: 400;\"> while retaining an existing PLC?<\/span><\/p><p><span style=\"font-weight: 400;\">Share your <\/span><b>PLC model, current HMI information, communication interface, installation dimensions, and target operator functions<\/b><span style=\"font-weight: 400;\"> with BIS.<\/span><\/p><p><span style=\"font-weight: 400;\">Our team can discuss Industrial Panel PC configuration and project integration requirements with you, helping establish the technical scope and identify the compatibility, installation, software, and maintenance items that should be evaluated before implementation.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>How an Industrial Panel PC Can Support Legacy Machine Modernization Many factories still rely on legacy machines that have operated reliably for years. Their PLCs run established control programs, operators understand the equipment, and the machines may continue to meet production requirements. The challenge is often not the PLC itself. The existing HMI or operator [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5205,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[35],"tags":[],"class_list":["post-5204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technique"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.0 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Modernizing Legacy Machines Without Replacing the PLC - Beyond Info Sys<\/title>\n<meta name=\"description\" content=\"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/beyondinfosys.com\/fr\/modernizing-legacy-machines-without-replacing-the-plc\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernizing Legacy Machines Without Replacing the PLC\" \/>\n<meta property=\"og:description\" content=\"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/beyondinfosys.com\/fr\/modernizing-legacy-machines-without-replacing-the-plc\/\" \/>\n<meta property=\"og:site_name\" content=\"Beyond Info Sys\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T13:30:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Oliva\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:description\" content=\"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Oliva\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/\"},\"author\":{\"name\":\"Oliva\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#\\\/schema\\\/person\\\/415ee39e196bc1db46cb71392bc5fb78\"},\"headline\":\"Modernizing Legacy Machines Without Replacing the PLC\",\"datePublished\":\"2026-09-29T13:30:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/\"},\"wordCount\":2114,\"publisher\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png\",\"articleSection\":[\"Technique\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/\",\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/\",\"name\":\"Modernizing Legacy Machines Without Replacing the PLC - Beyond Info Sys\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png\",\"datePublished\":\"2026-09-29T13:30:46+00:00\",\"description\":\"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#primaryimage\",\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png\",\"contentUrl\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png\",\"width\":1672,\"height\":941,\"caption\":\"Operator using an Industrial Panel PC mounted on legacy production machinery beside an existing PLC cabinet\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/modernizing-legacy-machines-without-replacing-the-plc\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/beyondinfosys.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modernizing Legacy Machines Without Replacing the PLC\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#website\",\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/\",\"name\":\"Beyond Info Sys\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/beyondinfosys.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#organization\",\"name\":\"Beyond Info Sys\",\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/LOGO-full.svg\",\"contentUrl\":\"https:\\\/\\\/beyondinfosys.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/LOGO-full.svg\",\"width\":219,\"height\":83,\"caption\":\"Beyond Info Sys\"},\"image\":{\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/beyondinfosys.com\\\/#\\\/schema\\\/person\\\/415ee39e196bc1db46cb71392bc5fb78\",\"name\":\"Oliva\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g\",\"caption\":\"Oliva\"},\"url\":\"https:\\\/\\\/beyondinfosys.com\\\/fr\\\/author\\\/oliva\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Modernizing Legacy Machines Without Replacing the PLC - Beyond Info Sys","description":"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/beyondinfosys.com\/fr\/modernizing-legacy-machines-without-replacing-the-plc\/","og_locale":"fr_FR","og_type":"article","og_title":"Modernizing Legacy Machines Without Replacing the PLC","og_description":"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.","og_url":"https:\/\/beyondinfosys.com\/fr\/modernizing-legacy-machines-without-replacing-the-plc\/","og_site_name":"Beyond Info Sys","article_published_time":"2026-09-29T13:30:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png","type":"image\/png"}],"author":"Oliva","twitter_card":"summary_large_image","twitter_description":"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.","twitter_misc":{"\u00c9crit par":"Oliva","Dur\u00e9e de lecture estim\u00e9e":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#article","isPartOf":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/"},"author":{"name":"Oliva","@id":"https:\/\/beyondinfosys.com\/#\/schema\/person\/415ee39e196bc1db46cb71392bc5fb78"},"headline":"Modernizing Legacy Machines Without Replacing the PLC","datePublished":"2026-09-29T13:30:46+00:00","mainEntityOfPage":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/"},"wordCount":2114,"publisher":{"@id":"https:\/\/beyondinfosys.com\/#organization"},"image":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#primaryimage"},"thumbnailUrl":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png","articleSection":["Technique"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/","url":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/","name":"Modernizing Legacy Machines Without Replacing the PLC - Beyond Info Sys","isPartOf":{"@id":"https:\/\/beyondinfosys.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#primaryimage"},"image":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#primaryimage"},"thumbnailUrl":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png","datePublished":"2026-09-29T13:30:46+00:00","description":"Learn how an Industrial Panel PC may support legacy machine modernisation while keeping an existing PLC, subject to interface, software and site requirements.","breadcrumb":{"@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#primaryimage","url":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png","contentUrl":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2026\/09\/Operator-using-an-Industrial-Panel-PC-mounted-on-legacy-production-machinery-beside-an-existing-PLC-cabinet.png","width":1672,"height":941,"caption":"Operator using an Industrial Panel PC mounted on legacy production machinery beside an existing PLC cabinet"},{"@type":"BreadcrumbList","@id":"https:\/\/beyondinfosys.com\/modernizing-legacy-machines-without-replacing-the-plc\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/beyondinfosys.com\/"},{"@type":"ListItem","position":2,"name":"Modernizing Legacy Machines Without Replacing the PLC"}]},{"@type":"WebSite","@id":"https:\/\/beyondinfosys.com\/#website","url":"https:\/\/beyondinfosys.com\/","name":"Beyond Info Sys","description":"","publisher":{"@id":"https:\/\/beyondinfosys.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/beyondinfosys.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/beyondinfosys.com\/#organization","name":"Beyond Info Sys","url":"https:\/\/beyondinfosys.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/beyondinfosys.com\/#\/schema\/logo\/image\/","url":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2025\/01\/LOGO-full.svg","contentUrl":"https:\/\/beyondinfosys.com\/wp-content\/uploads\/2025\/01\/LOGO-full.svg","width":219,"height":83,"caption":"Beyond Info Sys"},"image":{"@id":"https:\/\/beyondinfosys.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/beyondinfosys.com\/#\/schema\/person\/415ee39e196bc1db46cb71392bc5fb78","name":"Oliva","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/96f492cb2dc7af2f8b668e2b10193a0ca59e2cb0cfdb3dc9c38334f71b8570b8?s=96&d=mm&r=g","caption":"Oliva"},"url":"https:\/\/beyondinfosys.com\/fr\/author\/oliva\/"}]}},"_links":{"self":[{"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/posts\/5204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/comments?post=5204"}],"version-history":[{"count":7,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/posts\/5204\/revisions"}],"predecessor-version":[{"id":5212,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/posts\/5204\/revisions\/5212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/media\/5205"}],"wp:attachment":[{"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/media?parent=5204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/categories?post=5204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/beyondinfosys.com\/fr\/wp-json\/wp\/v2\/tags?post=5204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}